Element 7.5
Recycling and reuse
- Sheet
- 7.5
- State
- Open for contributions
- Release
- 16 November 2026
- Editor
- Open
- Reviewers
- Open
- Safety
- S3, as the chapter
- Licence
- CC BY-SA 4.0
- Resources
- 2
The element
- Requirement
- What must be true, in one or two sentences.
- How to tell
- The check or measure, with a source for any threshold.
- Options
- The recognised ways of meeting the requirement, and when each fits: climate, scale, cost and skill.
- Between 30 adults and 300 people
- What changes between the two reference scales.
- Settled, open, contested
- What is agreed, what is unknown, and where practitioners disagree.
- The standing questions
- Who can afford this? Who does the work? Who decides?
The four stages
Reference designs
-
Reference design
Machines and methods for recycling plastic at small scale. Its site states 1,100 workspaces in 56 countries in 2024.
External resource. Not made or verified by Public ProtocolMaturity: ReplicatedSafety S2Listed 16 November 2026
Parts list
Every resource that supports this element. Those marked External carry the label “External resource. Not made or verified by Public Protocol”.
| Resource | Type | Origin | Maturity | Safety | Licence, as stated at its source |
|---|---|---|---|---|---|
| iFixit | Library | External | Established | S1 | CC BY-NC-SA 3.0 |
| Precious Plastic | Reference design | External | Replicated | S2 | "Creative Commons Attribution", as its site states |
Depends on, and completes
Links between single elements are recorded as elements are drafted. The chapter as a whole needs 3 Water, 6 Shelter and construction, 5 Energy.
It is one of 6 elements that complete Waste, sanitation and material cycles.
Safety
State and evidence
Open for contributions
The element is named and its place in the blueprint is fixed. Resources may be listed under it. Its own text is waiting for an editor.
Evidence from a real place or system is recorded here, with what did not work. What the states mean
History
- Added in the release of 16 November 2026.