Public Protocol
Platform

Element 22.7

Measurement and standards

Sheet
22.7
Chapter
22 Delivery, operations and measurement
State
Open for contributions
Release
16 November 2026
Editor
Open
Reviewers
Open
Safety
S2, as the chapter
Licence
CC BY-SA 4.0
Resources
4

Open for contributions This element has its place in the blueprint and 4 resources listed under it. Its own text is written by an editor from reviewed resources. Contribute to 22.7

The element

Requirement
What must be true, in one or two sentences.
How to tell
The check or measure, with a source for any threshold.
Options
The recognised ways of meeting the requirement, and when each fits: climate, scale, cost and skill.
Between 30 adults and 300 people
What changes between the two reference scales.
Settled, open, contested
What is agreed, what is unknown, and where practitioners disagree.
The standing questions
Who can afford this? Who does the work? Who decides?

The four stages

1 Learn

Understand

2 Design

Size and choose

3 Build

Build or obtain

Open Add a resource

4 Deploy

Install, run and measure

Open Add a resource

Reference designs

Open for contributions Designs with drawings, specifications and a bill of materials. Add to it

Parts list

Every resource that supports this element. Those marked External carry the label “External resource. Not made or verified by Public Protocol”.

ResourceTypeOriginMaturitySafetyLicence, as stated at its source
Digital Public Goods StandardStandardExternalNot assessedS0Not read on the date checked
Open Definition 2.1StandardExternalEstablishedS0Not read on the date checked
Open Know-HowStandardExternalNot assessedS0CC BY-SA 4.0, named for the related standard
The Sustainable Development GoalsFrameworkExternalEstablishedS0Not read on the date checked

Depends on, and completes

Links between single elements are recorded as elements are drafted. The chapter as a whole needs 15 Governance and decision-making, 17 Financial infrastructure, 1 Place and planning.

It is one of 8 elements that complete Delivery, operations and measurement.

Safety

State and evidence

Open for contributions

The element is named and its place in the blueprint is fixed. Resources may be listed under it. Its own text is waiting for an editor.

Evidence from a real place or system is recorded here, with what did not work. What the states mean

History