Public Protocol
Platform

Library

Fika (formerly Bridges to Prosperity) resources

External resource. Not made or verified by Public Protocol.

Resource page of Fika, renamed from Bridges to Prosperity in January 2026, which works with governments and communities on trail bridges. It lists a fifth-edition Bridge Builder Manual (2018), obtained by submitting a form, a 2025 comparative study of suspension footbridge construction in Ethiopia and Rwanda, and impact studies.

Go to the source

https://fika.org/resources/

Maintainer
Fika
Licence, as stated at its source
All rights reserved (page footer: 2026 (c) Fika)
Open or commercial
Not stated by the maker
Maturity
ReplicatedOur reading, 16 November 2026
Safety
S3structural, fall
Review
Listed 16 November 2026by Public Protocol editors
Checked
16 November 2026
Next check due
16 May 2027
Steward
Public Protocol editors

Where it sits in the blueprint

Stages

Learn, Build

Context

Climate, setting, scale, cost and skill: not stated in this entry. Check the source against your own place and numbers.

Verification

No verification is recorded on Public Platform for this entry. Records are added when someone reads it for accuracy, reviews it with a stated qualification, builds it or measures it.

Record

How it came in

Seed catalogue, 16 November 2026. Listed from Praecise open research. The source was opened and described on the date shown.

Licence

All rights reserved (page footer: 2026 (c) Fika). Read at https://fika.org/resources/. How licences are recorded