Reference design
Global Hydrogen Review 2025
External resource. Not made or verified by Public Protocol.
IEA review of 12 September 2025. Its executive summary states that low-emissions hydrogen was below 1% of global output in 2024, that installed water electrolysis was 2 GW in 2024, that the announced 2030 pipeline fell from 49 to 37 Mt a year with electrolysis over 80% of the drop, and gives installed electrolyser costs of USD 2,000 to 2,600 per kW outside China and USD 600 to 1,200 per kW for Chinese systems in China.
https://www.iea.org/reports/global-hydrogen-review-2025
- Maintainer
- International Energy Agency
- Licence, as stated at its source
- CC BY 4.0
- Open or commercial
- Open
- Maturity
- EstablishedOur reading, 16 November 2026
- Safety
- S0
- Review
- Listed 16 November 2026by Public Protocol editors
- Checked
- 16 November 2026
- Next check due
- 16 May 2027
- Steward
- Public Protocol editors
Where it sits in the blueprint
- Domains
- Stages
Learn
- Elements it supports
- Context
Climate, setting, scale, cost and skill: not stated in this entry. Check the source against your own place and numbers.
Verification
No verification is recorded on Public Platform for this entry. Records are added when someone reads it for accuracy, reviews it with a stated qualification, builds it or measures it.
Record
- How it came in
Seed catalogue, 16 November 2026. Listed from open research on renewable generation. The report page and its executive summary were opened on the date shown.
- Licence
CC BY 4.0. Read at https://www.iea.org/reports/global-hydrogen-review-2025. How licences are recorded
- Something wrong?