Standard
Infrastructure for charging electric vehicles: Approved Document S
External resource. Not made or verified by Public Protocol.
Technical guidance for Part S of the Building Regulations in England on the installation of electric vehicle charge points in new residential and non-residential buildings, changes of use to dwellings and major renovations; first published 15 December 2021, last updated 17 April 2023.
https://www.gov.uk/government/publications/infrastructure-for-charging-electric-vehicles-approved-document-s
- Maintainer
- UK Ministry of Housing, Communities and Local Government
- Licence, as stated at its source
- Open Government Licence v3.0, except where otherwise stated
- Open or commercial
- Open
- Maturity
- EstablishedOur reading, 16 November 2026
- Safety
- S3electrical, fire, legal
- Review
- Listed 16 November 2026by Public Protocol editors
- Checked
- 16 November 2026
- Next check due
- 16 May 2027
- Steward
- Public Protocol editors
Where it sits in the blueprint
- Stages
Design, Build
- Elements it supports
- Context
Climate, setting, scale, cost and skill: not stated in this entry. Check the source against your own place and numbers.
Verification
No verification is recorded on Public Platform for this entry. Records are added when someone reads it for accuracy, reviews it with a stated qualification, builds it or measures it.
Record
- How it came in
Seed catalogue, 16 November 2026. Listed in the mobility research. The publication page was opened on the date shown; the 47-page PDF was not read.
- Licence
Open Government Licence v3.0, except where otherwise stated. Read at https://www.gov.uk/government/publications/infrastructure-for-charging-electric-vehicles-approved-document-s. How licences are recorded
- Something wrong?