Public Protocol
Platform

Guide

Borehole Drilling - Planning, Contracting and Management: A UNICEF Toolkit

External resource. Not made or verified by Public Protocol.

UNICEF toolkit (2018) by Adekile, Danert, Gesti Canuto, Zadi, Harvey and Cabrera-Clerget, based on the RWSN Code of Practice for Cost-Effective Boreholes. Five modules cover principles and responsibilities, procurement and contractor prequalification, terms of reference for siting and supervision, terms of reference for drilling and pump installation, and requests for proposals.

Go to the source

https://www.rural-water-supply.net/en/resources/details/826

Maintainer
UNICEF; listed by the Rural Water Supply Network
Licence, as stated at its source
Not stated on the page opened
Open or commercial
Open
Maturity
EstablishedOur reading, 16 November 2026
Safety
S0
Review
Listed 16 November 2026by Public Protocol editors
Checked
16 November 2026
Next check due
16 May 2027
Steward
Public Protocol editors

Where it sits in the blueprint

Domains
Stages

Design, Build

Context

Climate, setting, scale, cost and skill: not stated in this entry. Check the source against your own place and numbers.

Verification

No verification is recorded on Public Platform for this entry. Records are added when someone reads it for accuracy, reviews it with a stated qualification, builds it or measures it.

Record

How it came in

Seed catalogue, 16 November 2026. Listed from Praecise open research. The source was opened and described on the date shown.

Licence

Not stated on the page opened. Read at https://www.rural-water-supply.net/en/resources/details/826. How licences are recorded