Results and Lessons Learned from CorPower Ocean's Full Scale C4 Wave Energy Converter First Ocean Deployment Period

External resource. Not made or verified by Public Protocol.

A 2025 European Wave and Tidal Energy Conference paper by the developer's staff (DOI 10.36688/ewtec-2025-958). Its abstract reports that the full-scale converter off Aguçadoura, Portugal, survived four major storms with waves up to 18.5 m and resumed grid export after each, exported up to 600 kW, matched its digital twin at 96% to 99% goodness of fit, and that certified products are expected by 2026/2027.

Go to the source

https://proceedings.ewtec.org//proc-ewtec/article/view/958

Maintainer
European Wave and Tidal Energy Conference
Licence, as stated at its source
Copyright (c) 2025 European Wave and Tidal Energy Conference. Some rights reserved.
Open or commercial
Commercial
Maturity
PrototypeOur reading, 16 November 2026
Safety
S0
Review
Listed 16 November 2026by Public Protocol editors
Checked
16 November 2026
Next check due
16 May 2027
Steward
Public Protocol editors

Where it sits in the blueprint

Domains
Stages

Learn

Context

Climate, setting, scale, cost and skill: not stated in this entry. Check the source against your own place and numbers.

Verification

No verification is recorded on Public Platform for this entry. Records are added when someone reads it for accuracy, reviews it with a stated qualification, builds it or measures it.

Record

How it came in

Seed catalogue, 16 November 2026. Listed from open research on renewable generation. The source was opened and described on the date shown.

Licence

Copyright (c) 2025 European Wave and Tidal Energy Conference. Some rights reserved.. Read at https://proceedings.ewtec.org//proc-ewtec/article/view/958. How licences are recorded