Results and Lessons Learned from CorPower Ocean's Full Scale C4 Wave Energy Converter First Ocean Deployment Period
External resource. Not made or verified by Public Protocol.
A 2025 European Wave and Tidal Energy Conference paper by the developer's staff (DOI 10.36688/ewtec-2025-958). Its abstract reports that the full-scale converter off Aguçadoura, Portugal, survived four major storms with waves up to 18.5 m and resumed grid export after each, exported up to 600 kW, matched its digital twin at 96% to 99% goodness of fit, and that certified products are expected by 2026/2027.
https://proceedings.ewtec.org//proc-ewtec/article/view/958
- Maintainer
- European Wave and Tidal Energy Conference
- Licence, as stated at its source
- Copyright (c) 2025 European Wave and Tidal Energy Conference. Some rights reserved.
- Open or commercial
- Commercial
- Maturity
- PrototypeOur reading, 16 November 2026
- Safety
- S0
- Review
- Listed 16 November 2026by Public Protocol editors
- Checked
- 16 November 2026
- Next check due
- 16 May 2027
- Steward
- Public Protocol editors
Where it sits in the blueprint
- Domains
- Stages
Learn
- Elements it supports
- Context
Climate, setting, scale, cost and skill: not stated in this entry. Check the source against your own place and numbers.
Verification
No verification is recorded on Public Platform for this entry. Records are added when someone reads it for accuracy, reviews it with a stated qualification, builds it or measures it.
Record
- How it came in
Seed catalogue, 16 November 2026. Listed from open research on renewable generation. The source was opened and described on the date shown.
- Licence
Copyright (c) 2025 European Wave and Tidal Energy Conference. Some rights reserved.. Read at https://proceedings.ewtec.org//proc-ewtec/article/view/958. How licences are recorded
- Something wrong?