Element 5.19

Marine energy: tidal and wave

Sheet
5.19
Chapter
5 Energy
State
Drafted
Release
16 November 2026
Editor
Contributed by Praecise as open research
Reviewers
To be named at review
Safety
S3, as the chapter
Licence
CC BY-SA 4.0
Resources
4

The element

Requirement

A coastal or island community knows how mature tidal and wave energy are before it counts on them. It does not rely on them for primary supply until machines of the type have run for years in comparable water; it may host or join a demonstration with a developer that carries the engineering and the risk.

How to tell

The community can state, from current sources, the scale of the sector and the record of the specific machine on offer. Worldwide, about 513 MW of ocean power was operating in 2024, almost all of it two tidal range plants (La Rance in France, 240 MW, and Sihwa in the Republic of Korea, 254 MW); 1.6 MW was added that year, and REN21 describes the sector as still in the early stages of commercialisation (Renewables 2025 Global Status Report: Ocean Power). Ocean Energy Europe puts the largest tidal turbines at around 2 MW and the most powerful wave converters at around 1 MW (Ocean energy is moving closer to commercialisation).

Options

Tidal range. Barrages or lagoons that hold the tide. Large civil works, and REN21 states that suitable sites are limited and few new projects are proposed (Renewables 2025 Global Status Report: Ocean Power).

Tidal stream arrays. Underwater turbines in fast tidal channels. The 6 MW MeyGen array in Scotland's Pentland Firth has run since 2018 and generated more than 84 GWh by November 2025; the European Marine Energy Centre states that subsea turbine servicing is becoming routine offshore practice (Offshore operations at MeyGen's tidal array). In 2024 a 1.2 MW tidal device in the Faroe Islands delivered its first electricity to the grid (Renewables 2025 Global Status Report: Ocean Power).

Wave energy converters. A full-scale converter off Aguçadoura, Portugal, survived four major storms with waves up to 18.5 m and resumed grid export after each, exporting up to 600 kW; its developer expects certified products by 2026/2027 (Results and Lessons Learned from CorPower Ocean's Full Scale C4 Wave Energy Converter First Ocean Deployment Period). A full-scale wave collector was installed at the PLOCAN test site in the Canary Islands in 2024 (Renewables 2025 Global Status Report: Ocean Power).

Hosting a demonstration. Ocean Energy Europe lists 165 MW across 15 publicly supported farms planned over five years, and states that first wave farms need national revenue support to be bankable (Ocean energy is moving closer to commercialisation). A community with a strong tidal channel or wave climate can be a host site and share in what is learned.

Settled, open, contested

Settled. Offshore installation and servicing, subsea cables and rotating machines in the sea are S3 work for specialist marine contractors.

Open. Cost and long-term reliability at array scale. EMEC states that a 200 MW-plus array will need more experienced people, proven procedures and reliable subsea methods (Offshore operations at MeyGen's tidal array).

Contested. Whether public revenue support for marine energy is better spent than on mature technologies; the sources opened describe the support but do not settle the question.

The four stages

Learn: (Renewables 2025 Global Status Report: Ocean Power) (Ocean energy is moving closer to commercialisation). Design: resource and environmental studies by the developer, with the marine licensing authority. Build: by the developer and marine contractors; this page gives no procedure. Deploy: the community asks for public reporting of output and availability, as MeyGen reports cumulative output (Offshore operations at MeyGen's tidal array).

Resources at each stage

What changes between 30 adults and 300 people

For 30 adults, marine energy is a partnership to watch, not a supply to plan on; solar, wind and storage carry the load. For 300 people on an island with a strong tidal channel, hosting a demonstration turbine with a developer can add generation and local work, while the community's own system is still sized without it.

Reference designs

  • Reference design

    Renewables 2025 Global Status Report: Ocean Power

    REN21's 2025 chapter on ocean power. It states 1.6 MW added in 2024 and about 513 MW operating, most of it in two tidal range plants (La Rance, 240 MW, and Sihwa, 254 MW); names 2024 deployments in the Faroe Islands, the Canary Islands and Portugal; and describes the sector as still in the early stages of commercialisation.

    External resource. Not made or verified by Public ProtocolMaturity: EstablishedSafety S0Listed 16 November 2026

Parts list

Every resource that supports this element. Those marked External carry the label “External resource. Not made or verified by Public Protocol”.

ResourceTypeOriginMaturitySafetyLicence, as stated at its source
Results and Lessons Learned from CorPower Ocean's Full Scale C4 Wave Energy Converter First Ocean Deployment PeriodPaperExternalPrototypeS0Copyright (c) 2025 European Wave and Tidal Energy Conference. Some rights reserved.
Offshore operations at MeyGen's tidal arrayCase studyExternalWorkingS3Not stated on the page opened
Ocean energy is moving closer to commercialisationCase studyExternalWorkingS0Not stated on the page opened
Renewables 2025 Global Status Report: Ocean PowerReference designExternalEstablishedS0© 2025 All rights reserved REN21

Depends on, and completes

Depends on 5.2.

It is one of 23 elements that complete Energy.

The standing questions

Who fishes or sails where the machines will sit. Who gains from a demonstration on the community's shore. Who decides on the marine licence.

Environments

Islands and coasts. All the deployments named here are on islands or exposed coasts: the Pentland Firth in Scotland, the Faroe Islands, the Canary Islands and northern Portugal (Offshore operations at MeyGen's tidal array) (Renewables 2025 Global Status Report: Ocean Power) (Results and Lessons Learned from CorPower Ocean's Full Scale C4 Wave Energy Converter First Ocean Deployment Period).

Arctic cold. No source found.

Hot deserts. Not applicable except on desert coasts; no source found.

Tropical humid forest. No source found.

Temperate forest. Not applicable.

High altitude. Not applicable.

Flood plains. No source found.

Other harsh settings. Storm survival at full scale is documented for one wave converter, with waves up to 18.5 m (Results and Lessons Learned from CorPower Ocean's Full Scale C4 Wave Energy Converter First Ocean Deployment Period).

Safety

State and evidence

Drafted

An editor has written the element's text from the resources listed under it, citing them. It is checked when it is reviewed.

Evidence from a real place or system is recorded here, with what did not work. What the states mean

History