Guide
Micro Hydro Power (MHP) Plants
External resource. Not made or verified by Public Protocol.
An open wiki page on small hydropower: size classes (pico up to 5 kW, micro 5 to 100 kW, mini 100 to 500 kW), the parts of a run-of-river scheme from weir to electronic load controller, ownership and maintenance models, and installed cost ranges it attributes to GIZ (USD 1,000 to more than 10,000 per kW, 2010) and Practical Action (about 1,200 to 4,000 pounds per kW). Last edited in 2014, so its costs are old.
https://energypedia.info/wiki/Micro_Hydro_Power_(MHP)_Plants
- Maintainer
- energypedia
- Licence, as stated at its source
- Creative Commons Attribution-ShareAlike 4.0 Unported License
- Open or commercial
- Open
- Maturity
- EstablishedOur reading, 16 November 2026
- Safety
- S3electrical, structural, machinery
- Review
- Listed 16 November 2026by Public Protocol editors
- Checked
- 16 November 2026
- Next check due
- 16 May 2027
- Steward
- Public Protocol editors
Where it sits in the blueprint
- Domains
- Stages
Learn, Design
- Elements it supports
- Context
Climate, setting, scale, cost and skill: not stated in this entry. Check the source against your own place and numbers.
Verification
No verification is recorded on Public Platform for this entry. Records are added when someone reads it for accuracy, reviews it with a stated qualification, builds it or measures it.
Record
- How it came in
Seed catalogue, 16 November 2026. Listed from open research on renewable generation. The source was opened and described on the date shown.
- Licence
Creative Commons Attribution-ShareAlike 4.0 Unported License. Read at https://energypedia.info/wiki/Micro_Hydro_Power_(MHP)_Plants. How licences are recorded
- Something wrong?