Public Protocol
Platform

Case study

World's largest 1 MW/100 MWh sand battery commissioned in Finland

External resource. Not made or verified by Public Protocol.

A June 2025 news report on the sand battery commissioned for the district heating network of Pornainen, Finland: 1 MW of heat, 100 MWh of storage in about 2,000 tonnes of crushed soapstone, almost 13 m tall and 15 m wide. It states the store covers close to a month of summer heat demand and close to a week of winter demand, lets the network stop using oil, cuts wood chip use by about 60% and cuts the network's emissions by nearly 70%.

Go to the source

https://www.pv-magazine.com/2025/06/11/worlds-largest-1-mw-100-mwh-sand-battery-commissioned-in-finland/

Maintainer
pv magazine
Licence, as stated at its source
This content is protected by copyright and may not be reused.
Open or commercial
Open
Maturity
WorkingOur reading, 16 November 2026
Safety
S3electrical, fire
Review
Listed 16 November 2026by Public Protocol editors
Checked
16 November 2026
Next check due
16 May 2027
Steward
Public Protocol editors

Where it sits in the blueprint

Domains
Stages

Learn

Context

Climate, setting, scale, cost and skill: climate: boreal; setting: Scale at the source: municipal district heating network

Verification

No verification is recorded on Public Platform for this entry. Records are added when someone reads it for accuracy, reviews it with a stated qualification, builds it or measures it.

Record

How it came in

Seed catalogue, 16 November 2026. Listed from Praecise open research. The source was opened and described on the date shown.

Licence

This content is protected by copyright and may not be reused.. Read at https://www.pv-magazine.com/2025/06/11/worlds-largest-1-mw-100-mwh-sand-battery-commissioned-in-finland/. How licences are recorded