Eavor's First-of-Its-Kind Closed-Loop Geothermal Project Produces Grid Power in Germany
External resource. Not made or verified by Public Protocol.
POWER magazine report on the closed-loop geothermal project at Geretsried, Bavaria, which the developer says delivered electricity to the grid on 4 December 2025. Two vertical wells feed twelve horizontal laterals joined underground; the project deploys four loops rated at 64 MWth and 8 MWe for the municipality, and was supported by a 91.6 million euro EU Innovation Fund grant and German feed-in tariffs of about 250 euros per MWh.
https://www.powermag.com/eavors-first-of-its-kind-closed-loop-geothermal-project-produces-grid-power-in-germany/
- Maintainer
- POWER magazine
- Licence, as stated at its source
- Not stated on the page opened
- Open or commercial
- Commercial
- Maturity
- PrototypeOur reading, 16 November 2026
- Safety
- S3electrical, pressure, structural
- Review
- Listed 16 November 2026by Public Protocol editors
- Checked
- 16 November 2026
- Next check due
- 16 May 2027
- Steward
- Public Protocol editors
Where it sits in the blueprint
- Domains
- Stages
Learn
- Elements it supports
- Context
Climate, setting, scale, cost and skill: not stated in this entry. Check the source against your own place and numbers.
Verification
No verification is recorded on Public Platform for this entry. Records are added when someone reads it for accuracy, reviews it with a stated qualification, builds it or measures it.
Record
- How it came in
Seed catalogue, 16 November 2026. Listed from open research on renewable generation. The source was opened and described on the date shown.
- Licence
Not stated on the page opened. Read at https://www.powermag.com/eavors-first-of-its-kind-closed-loop-geothermal-project-produces-grid-power-in-germany/. How licences are recorded
- Something wrong?