Reference design
Renewables 2025 Global Status Report: Ocean Power
External resource. Not made or verified by Public Protocol.
REN21's 2025 chapter on ocean power. It states 1.6 MW added in 2024 and about 513 MW operating, most of it in two tidal range plants (La Rance, 240 MW, and Sihwa, 254 MW); names 2024 deployments in the Faroe Islands, the Canary Islands and Portugal; and describes the sector as still in the early stages of commercialisation.
https://www.ren21.net/gsr-2025/technologies/ocean-power/
- Maintainer
- REN21
- Licence, as stated at its source
- © 2025 All rights reserved REN21
- Open or commercial
- Open
- Maturity
- EstablishedOur reading, 16 November 2026
- Safety
- S0
- Review
- Listed 16 November 2026by Public Protocol editors
- Checked
- 16 November 2026
- Next check due
- 16 May 2027
- Steward
- Public Protocol editors
Where it sits in the blueprint
- Domains
- Stages
Learn
- Elements it supports
- Context
Climate, setting, scale, cost and skill: not stated in this entry. Check the source against your own place and numbers.
Verification
No verification is recorded on Public Platform for this entry. Records are added when someone reads it for accuracy, reviews it with a stated qualification, builds it or measures it.
Record
- How it came in
Seed catalogue, 16 November 2026. Listed from open research on renewable generation. The source was opened and described on the date shown.
- Licence
© 2025 All rights reserved REN21. Read at https://www.ren21.net/gsr-2025/technologies/ocean-power/. How licences are recorded
- Something wrong?