REN21's 2025 chapter on ocean power. It states 1.6 MW added in 2024 and about 513 MW operating, most of it in two tidal range plants (La Rance, 240 MW, and Sihwa, 254 MW); names 2024 deployments in the Faroe Islands, the Canary Islands and Portugal; and describes the sector as still in the early stages of commercialisation.

Go to the source

https://www.ren21.net/gsr-2025/technologies/ocean-power/

Maintainer
REN21
Licence, as stated at its source
© 2025 All rights reserved REN21
Open or commercial
Open
Maturity
EstablishedOur reading, 16 November 2026
Safety
S0
Review
Listed 16 November 2026by Public Protocol editors
Checked
16 November 2026
Next check due
16 May 2027
Steward
Public Protocol editors

Where it sits in the blueprint

Domains
Stages

Learn

Context

Climate, setting, scale, cost and skill: not stated in this entry. Check the source against your own place and numbers.

Verification

No verification is recorded on Public Platform for this entry. Records are added when someone reads it for accuracy, reviews it with a stated qualification, builds it or measures it.

Record

How it came in

Seed catalogue, 16 November 2026. Listed from open research on renewable generation. The source was opened and described on the date shown.

Licence

© 2025 All rights reserved REN21. Read at https://www.ren21.net/gsr-2025/technologies/ocean-power/. How licences are recorded