Paper
Fire safe implementation of visible mass timber in tall buildings: compartment fire testing (RISE Report 2020:94)
External resource. Not made or verified by Public Protocol.
Five real-scale, four-hour compartment fire tests on cross-laminated timber slabs and glulam beams and columns made to current US product standards, with exposed timber up to twice the floor area. The report finds such compartments can decay to hot spots and embers after flashover, that two exposed wall surfaces meeting in a corner should be avoided, and that its conclusions hold only for timber shown not to delaminate in long fires, as ANSI/APA PRG 320 (2018) requires, in the case where sprinklers and fire service both fail.
https://web-media.awc.org/wp-content/uploads/2022/02/17210507/Report-2-Summary-report-FINALcorrected_0.pdf
- Maintainer
- RISE Research Institutes of Sweden; hosted by the American Wood Council
- Licence, as stated at its source
- Not stated on the page opened
- Open or commercial
- Open
- Maturity
- ReplicatedOur reading, 16 November 2026
- Safety
- S3fire, structural
- Review
- Listed 16 November 2026by Public Protocol editors
- Checked
- 16 November 2026
- Next check due
- 16 May 2027
- Steward
- Public Protocol editors
Where it sits in the blueprint
- Domains
- Stages
Learn, Design
- Elements it supports
- Context
Climate, setting, scale, cost and skill: not stated in this entry. Check the source against your own place and numbers.
Verification
No verification is recorded on Public Platform for this entry. Records are added when someone reads it for accuracy, reviews it with a stated qualification, builds it or measures it.
Record
- How it came in
Seed catalogue, 16 November 2026. Listed from Praecise open research. The report (corrected 12 March 2021) was opened and described on the date shown.
- Licence
Not stated on the page opened. Read at https://web-media.awc.org/wp-content/uploads/2022/02/17210507/Report-2-Summary-report-FINALcorrected_0.pdf. How licences are recorded
- Something wrong?