The element
- Requirement
The community knows which kind of geothermal energy its ground offers: shallow ground heat for heat pumps, which almost every site has, or a hot resource deep enough for electricity, which few have. It generates electricity from the ground only where a resource has been proven by survey and drilling done under licence by qualified people.
- How to tell
Shallow ground heat is handled with heat pumps under 5.5 Heat and cooling. For power, a temperature and flow have been measured in a well, not assumed. The IEA states that geothermal meets less than 1% of global energy demand today and that plants ran at over 75% average utilisation in 2023, against under 30% for wind and under 15% for solar PV (The Future of Geothermal Energy): where it exists, it is steady power.
- Options
Small binary plants on low-temperature water. At Chena Hot Springs in interior Alaska, an off-grid resort generates from 74 degrees C water through a closed loop using R134a as working fluid; its first units ran from 2005 and 2006 and it cites a 2007 paper on the 400 kW plant (Chena Hot Springs Resort: Geothermal Power). This fits a community with a known hot spring and remote from a grid.
Conventional hydrothermal plants. Where a natural hot reservoir exists; usually larger than one community and built by a utility or developer.
Enhanced geothermal. Engineered permeability in hot rock. Cape Station in Utah synchronised its first 33 MW unit in September 2026, the first of a 100 MW first phase (Fervo Energy reports first power generation at Cape Station enhanced geothermal site, Utah). This is utility scale.
Closed-loop geothermal. Sealed wells in which fluid circulates without contact with the rock's water. At Geretsried in Bavaria four loops rated at 64 MWth and 8 MWe supply the municipality with heat and power; grid delivery began in December 2025, supported by an EU grant and feed-in tariffs (Eavor's First-of-Its-Kind Closed-Loop Geothermal Project Produces Grid Power in Germany).
Geothermal heat networks. The IEA estimates large potential for heat from hot sedimentary aquifers up to 3 km deep and roughly ten times more for lower-temperature heat (The Future of Geothermal Energy).
- Settled, open, contested
Settled. Drilling, high-pressure hot fluids and working fluids are S3 hazards; wells and plants are licensed and built by specialists.
Open. Cost. The IEA states next-generation geothermal could fall in cost by 80% by 2035 to around 50 US dollars per MWh and meet up to 15% of electricity demand growth to 2050 (The Future of Geothermal Energy). Both new projects named here relied on public support or large contracts (Eavor's First-of-Its-Kind Closed-Loop Geothermal Project Produces Grid Power in Germany) (Fervo Energy reports first power generation at Cape Station enhanced geothermal site, Utah).
Contested. Hydraulic stimulation in enhanced systems against closed loops that avoid it; the sources opened do not settle which costs less.
The four stages
Learn: (The Future of Geothermal Energy). Design: national geological survey data, then exploration by a licensed geothermal consultant; electrical integration to the IEC 62257 series where off grid (IEC TS 62257-100:2022 Renewable energy off-grid systems - Part 100: Overview of the IEC 62257 series). Build: drilling and plant by licensed contractors; this page gives no procedure. Deploy: log output, well pressure and temperature; plan for the resource to decline and for reinjection.
Resources at each stage
1 Learn
Understand
- Chena Hot Springs Resort: Geothermal Power Case study, S3
- Eavor's First-of-Its-Kind Closed-Loop Geothermal Project Produces Grid Power in Germany Case study, S3
- Fervo Energy reports first power generation at Cape Station enhanced geothermal site, Utah Case study, S3
- The Future of Geothermal Energy Reference design, S0
2 Design
Size and choose
3 Build
Build or obtain
What changes between 30 adults and 300 people
For 30 adults, geothermal power is out of reach unless a proven hot spring is on the land; ground-source heat pumps are the realistic use. For 300 people, joining a municipal heat network or a developer's plant, as at Geretsried, is the realistic path where the geology allows.
Reference designs
-
Reference design
The Future of Geothermal Energy
IEA report of 13 December 2024. Its executive summary states that geothermal meets less than 1% of global energy demand, that next-generation geothermal could meet up to 15% of electricity demand growth to 2050 (about 800 GW), that its cost could fall by 80% by 2035 to around 50 US dollars per MWh, and that up to 80% of investment in a geothermal project uses capacity and skills common to oil and gas. Geothermal plants ran at over 75% average utilisation in 2023.
External resource. Not made or verified by Public ProtocolMaturity: EstablishedSafety S0Listed 16 November 2026
Parts list
Every resource that supports this element. Those marked External carry the label “External resource. Not made or verified by Public Protocol”.
| Resource | Type | Origin | Maturity | Safety | Licence, as stated at its source |
|---|---|---|---|---|---|
| Chena Hot Springs Resort: Geothermal Power | Case study | External | Working | S3 | Not stated on the page opened |
| Eavor's First-of-Its-Kind Closed-Loop Geothermal Project Produces Grid Power in Germany | Case study | External | Prototype | S3 | Not stated on the page opened |
| Fervo Energy reports first power generation at Cape Station enhanced geothermal site, Utah | Case study | External | Working | S3 | Not stated on the page opened |
| The Future of Geothermal Energy | Reference design | External | Established | S0 | CC BY 4.0 |
| IEC TS 62257-100:2022 Renewable energy off-grid systems - Part 100: Overview of the IEC 62257 series | Standard | External | Established | S2 | Not stated on the page opened |
The standing questions
Who owns the heat under the land. Who carries the risk of a dry well. Who decides whether to drill.
Environments
Islands and coasts. No source found.
Arctic cold. Chena Hot Springs generates off grid in subarctic Alaska from 74 degrees C water (Chena Hot Springs Resort: Geothermal Power).
Hot deserts. Cape Station is in Utah (Fervo Energy reports first power generation at Cape Station enhanced geothermal site, Utah); no source found on cooling-water limits in deserts.
Tropical humid forest. No source found.
Temperate forest. Geretsried, in Bavaria, supplies municipal heat and power (Eavor's First-of-Its-Kind Closed-Loop Geothermal Project Produces Grid Power in Germany).
High altitude. No source found.
Flood plains. No source found.
Other harsh settings. No source found.
Safety
State and evidence
Drafted
An editor has written the element's text from the resources listed under it, citing them. It is checked when it is reviewed.
Evidence from a real place or system is recorded here, with what did not work. What the states mean
History
- Drafted in the release of 16 November 2026.