Public Protocol
Platform

Case study

Offshore operations at MeyGen's tidal array

External resource. Not made or verified by Public Protocol.

European Marine Energy Centre blog post of 28 January 2026 on the 6 MW MeyGen tidal stream array in the Pentland Firth, running since 2018. It states more than 84 GWh generated by November 2025, a best month of 372 MWh for one turbine in 2025, and that subsea turbine servicing is becoming routine offshore practice as the sector moves towards early commercialisation.

Go to the source

https://www.emec.org.uk/?p=20966

Maintainer
European Marine Energy Centre (EMEC)
Licence, as stated at its source
Not stated on the page opened
Open or commercial
Not stated by the maker
Maturity
WorkingOur reading, 16 November 2026
Safety
S3electrical, machinery
Review
Listed 16 November 2026by Public Protocol editors
Checked
16 November 2026
Next check due
16 May 2027
Steward
Public Protocol editors

Where it sits in the blueprint

Domains
Stages

Learn

Context

Climate, setting, scale, cost and skill: setting: island, coastal

Verification

No verification is recorded on Public Platform for this entry. Records are added when someone reads it for accuracy, reviews it with a stated qualification, builds it or measures it.

Record

How it came in

Seed catalogue, 16 November 2026. Listed from open research on renewable generation. The source was opened and described on the date shown.

Licence

Not stated on the page opened. Read at https://www.emec.org.uk/?p=20966. How licences are recorded