Case study
Offshore operations at MeyGen's tidal array
External resource. Not made or verified by Public Protocol.
European Marine Energy Centre blog post of 28 January 2026 on the 6 MW MeyGen tidal stream array in the Pentland Firth, running since 2018. It states more than 84 GWh generated by November 2025, a best month of 372 MWh for one turbine in 2025, and that subsea turbine servicing is becoming routine offshore practice as the sector moves towards early commercialisation.
https://www.emec.org.uk/?p=20966
- Maintainer
- European Marine Energy Centre (EMEC)
- Licence, as stated at its source
- Not stated on the page opened
- Open or commercial
- Not stated by the maker
- Maturity
- WorkingOur reading, 16 November 2026
- Safety
- S3electrical, machinery
- Review
- Listed 16 November 2026by Public Protocol editors
- Checked
- 16 November 2026
- Next check due
- 16 May 2027
- Steward
- Public Protocol editors
Where it sits in the blueprint
- Domains
- Stages
Learn
- Elements it supports
- Context
Climate, setting, scale, cost and skill: setting: island, coastal
Verification
No verification is recorded on Public Platform for this entry. Records are added when someone reads it for accuracy, reviews it with a stated qualification, builds it or measures it.
Record
- How it came in
Seed catalogue, 16 November 2026. Listed from open research on renewable generation. The source was opened and described on the date shown.
- Licence
Not stated on the page opened. Read at https://www.emec.org.uk/?p=20966. How licences are recorded
- Something wrong?