Public Protocol
Platform

Case study

EnergyVille/imec and partners show outdoor stability of highly anticipated perovskite solar modules

External resource. Not made or verified by Public Protocol.

Press release of 7 January 2025 on two years of outdoor monitoring of 4 cm2 perovskite mini-modules in Cyprus, reported in ACS Energy Letters. The most durable kept 78% of its initial efficiency after one year; the release states that current perovskite modules keep such efficiency only for weeks to months. Further trials are planned in rainy, moderate and arid sites.

Go to the source

https://energyville.be/en/news/energyvilleimec-and-partners-show-outdoor-stability-highly-anticipated-perovskite-solar

Maintainer
EnergyVille and imec
Licence, as stated at its source
Not stated on the page opened
Open or commercial
Not stated by the maker
Maturity
PrototypeOur reading, 16 November 2026
Safety
S0
Review
Listed 16 November 2026by Public Protocol editors
Checked
16 November 2026
Next check due
16 May 2027
Steward
Public Protocol editors

Where it sits in the blueprint

Stages

Learn

Context

Climate, setting, scale, cost and skill: not stated in this entry. Check the source against your own place and numbers.

Verification

No verification is recorded on Public Platform for this entry. Records are added when someone reads it for accuracy, reviews it with a stated qualification, builds it or measures it.

Record

How it came in

Seed catalogue, 16 November 2026. Listed from open research on renewable generation. The source was opened and described on the date shown.

Licence

Not stated on the page opened. Read at https://energyville.be/en/news/energyvilleimec-and-partners-show-outdoor-stability-highly-anticipated-perovskite-solar. How licences are recorded