Guide
Residual Current Device (RCD) protection in Battery Energy Storage Systems (BESS), advisory note 3/2025
External resource. Not made or verified by Public Protocol.
New South Wales Government advisory note, issued August 2025, applying the Australian and New Zealand wiring rules AS/NZS 3000:2018 and AS/NZS 4777.1:2024 to batteries that provide back-up supply. It states that final subcircuits fed by the alternative supply need RCD protection, at most 30 mA in domestic and residential installations, that the RCD must be Type A because Type AC does not comply in this configuration, and that adding a back-up supply counts as an alteration that brings affected circuits up to current rules.
https://www.nsw.gov.au/housing-and-construction/compliance-and-regulation/electricians/electrical-standards-rules-and-notes/residual-current-device-rcd-protection-battery-energy-storage-systems-bess
- Maintainer
- New South Wales Government
- Licence, as stated at its source
- Copyright © 2026
- Open or commercial
- Open
- Maturity
- EstablishedOur reading, 16 November 2026
- Safety
- S3electrical, legal
- Review
- Listed 16 November 2026by Public Protocol editors
- Checked
- 16 November 2026
- Next check due
- 16 May 2027
- Steward
- Public Protocol editors
Where it sits in the blueprint
- Domains
- Stages
Design, Build
- Elements it supports
- Context
Climate, setting, scale, cost and skill: not stated in this entry. Check the source against your own place and numbers.
Verification
No verification is recorded on Public Platform for this entry. Records are added when someone reads it for accuracy, reviews it with a stated qualification, builds it or measures it.
Record
- How it came in
Seed catalogue, 16 November 2026. Listed in the seed research on electricity, batteries and mechanics. The source was opened and described on the date shown.
- Licence
Copyright © 2026. Read at https://www.nsw.gov.au/housing-and-construction/compliance-and-regulation/electricians/electrical-standards-rules-and-notes/residual-current-device-rcd-protection-battery-energy-storage-systems-bess. How licences are recorded
- Something wrong?