The element
- Requirement
Where the climate is extreme, through deep cold and permafrost, great heat, heavy snow or high humidity, the building's foundation, envelope and services are chosen for that climate from published guidance, and the design names the climate data and future climate it assumes.
- How to tell
The brief names the climate file used CBE Clima Tool. On permafrost, the foundation follows the national guidance in force: in Canada, four CSA Group documents developed between 2016 and 2021 cover infrastructure in permafrost (CSA PLUS 4011:19), foundations in permafrost (CSA PLUS 4011.1:19), thermosyphon foundations (CSA S500:21) and moderating thaw under existing buildings (CSA S501:21) Adaptation standards and guides for northern infrastructure and buildings in permafrost. In cold climates, indoor temperature is held within a published range; UNHCR gives 15 to 19 °C for emergency shelter in cold climates Emergency shelter standard. In hot or humid climates, hours above 25 °C and above 12 g/kg absolute humidity are counted against a limit, as the Passive House criteria do Criteria for Buildings: Passive House, EnerPHit, PHI Low Energy Building (Version 10c). Snow loads are taken from the code's actions About the EN Eurocodes.
- Options
On permafrost. Keep the ground frozen or allow for movement. The Canadian standards list site measures (grading, drainage, snow management, shading) and foundation measures (ventilated foundations, ground insulation, adjustable and levelling foundations, mechanical refrigeration and thermosyphons) Adaptation standards and guides for northern infrastructure and buildings in permafrost. A geotechnical engineer chooses among them.
In deep cold. A compact, highly insulated and airtight envelope with controlled ventilation, checked against climate data approved for the site Criteria for Buildings: Passive House, EnerPHit, PHI Low Energy Building (Version 10c).
In hot, dry climates. Heavy walls that store the day's heat and lose it at night, in earth block or masonry Compressed Stabilised Earth Block; shading sized from sun angles CBE Clima Tool.
In hot, humid climates. Shade and air movement, or an envelope that limits humidity with dehumidification where the overheating and humidity limits demand it Criteria for Buildings: Passive House, EnerPHit, PHI Low Energy Building (Version 10c).
- Settled, open, contested
Settled. On permafrost the foundation type depends on keeping or managing the ground's thermal state, and thaw under existing buildings can be moderated Adaptation standards and guides for northern infrastructure and buildings in permafrost.
Open. Which climate scenario to design for over a building's life. Dust and sand in desert buildings: no open source found in this work.
Contested. Rely on heavy mass and night cooling in hot climates, or on insulation and mechanical cooling; each fits a different daily temperature swing Compressed Stabilised Earth Block Criteria for Buildings: Passive House, EnerPHit, PHI Low Energy Building (Version 10c).
The four stages
Learn: the climate CBE Clima Tool; the regional standards Adaptation standards and guides for northern infrastructure and buildings in permafrost. Design: foundation by a geotechnical engineer on permafrost; envelope sized to the climate Criteria for Buildings: Passive House, EnerPHit, PHI Low Energy Building (Version 10c); snow and wind to code About the EN Eurocodes. Build: work seasons follow the climate; on permafrost, the site measures chosen in design (grading, drainage, snow management, shading) are built with the foundation Adaptation standards and guides for northern infrastructure and buildings in permafrost. Deploy: monitor ground temperature and settlement under buildings on permafrost; log indoor temperature and humidity.
Resources at each stage
1 Learn
Understand
- Compressed Stabilised Earth Block Guide, S3
- CBE Clima Tool Tool, S0
- Adaptation standards and guides for northern infrastructure and buildings in permafrost Standard, S3
- About the EN Eurocodes Standard, S3
- NFIP Technical Bulletins (FEMA) Library, S3
- Criteria for Buildings: Passive House, EnerPHit, PHI Low Energy Building (Version 10c) Standard, S1
- Emergency shelter standard Standard, S2
2 Design
Size and choose
- Compressed Stabilised Earth Block Guide, S3
- CBE Clima Tool Tool, S0
- Adaptation standards and guides for northern infrastructure and buildings in permafrost Standard, S3
- About the EN Eurocodes Standard, S3
- NFIP Technical Bulletins (FEMA) Library, S3
- Criteria for Buildings: Passive House, EnerPHit, PHI Low Energy Building (Version 10c) Standard, S1
- Emergency shelter standard Standard, S2
3 Build
Build or obtain
- Compressed Stabilised Earth Block Guide, S3
- NFIP Technical Bulletins (FEMA) Library, S3
4 Deploy
Install, run and measure
What changes between 30 adults and 300 people
Thirty adults can choose the best ground on a site and build compactly. Three hundred people need many building pads, roads and pipes, so ground conditions are mapped across the whole settlement, and shared buildings reduce the envelope per person in severe cold.
Reference designs
Open for contributions Designs with drawings, specifications and a bill of materials. Add to it
Parts list
Every resource that supports this element. Those marked External carry the label “External resource. Not made or verified by Public Protocol”.
| Resource | Type | Origin | Maturity | Safety | Licence, as stated at its source |
|---|---|---|---|---|---|
| Compressed Stabilised Earth Block | Guide | External | Established | S3 | Humanity as a whole, No rights reserved |
| CBE Clima Tool | Tool | External | Established | S0 | MIT |
| Adaptation standards and guides for northern infrastructure and buildings in permafrost | Standard | External | Established | S3 | Not stated on the page opened |
| About the EN Eurocodes | Standard | External | Established | S3 | Not stated on the page opened |
| NFIP Technical Bulletins (FEMA) | Library | External | Established | S3 | Not stated on the page opened |
| Criteria for Buildings: Passive House, EnerPHit, PHI Low Energy Building (Version 10c) | Standard | External | Established | S1 | This document is provided free of charge by the Passive House Institute (PHI). Digital copies may be distributed only in complete and in an unchanged form. Translations are only permitted after written agreement with the PHI. |
| Emergency shelter standard | Standard | External | Established | S2 | Not stated on the page opened |
Depends on, and completes
It is one of 22 elements that complete Shelter and construction.
The standing questions
Who pays for ground investigation and monitoring. Who maintains thermosyphons or ventilated foundations. Who decides which future climate the design assumes.
Environments
wind, surge and corrosion are covered under hazard-resistant building NFIP Technical Bulletins (FEMA).
permafrost foundations Adaptation standards and guides for northern infrastructure and buildings in permafrost; indoor range in cold climates Emergency shelter standard.
thermal mass and shading Compressed Stabilised Earth Block CBE Clima Tool; no source found on dust.
humidity and overheating limits Criteria for Buildings: Passive House, EnerPHit, PHI Low Energy Building (Version 10c).
no source found beyond general envelope guidance.
no source found.
see hazard-resistant building NFIP Technical Bulletins (FEMA).
Other harsh settings
heavy snow, by code About the EN Eurocodes.
Environment profiles for these settings: Small islands and coasts; Arctic, subarctic and permafrost, including sea ice; Extreme cold; Hot deserts; Extreme heat; Tropical rainforest and humid tropics; High humidity; Temperate and boreal forests; Mountains and high altitude; River deltas and flood plains. All environments
Safety
State and evidence
Drafted
An editor has written the element's text from the resources listed under it, citing them. It is checked when it is reviewed.
Evidence from a real place or system is recorded here, with what did not work. What the states mean
History
- Drafted in the release of 16 November 2026.